scale modeling database | stash manager
Mcsmith
Michael Smith (Mcsmith)
US

USS Bon Homme Richard (CV/CVA-31) Double Build

Album image #1
Album image #2
Album image #3
Album image #4
Album image #5
Album image #6
Day 1 - 68 gets hangar and hull blisters. 
 

Album image #7
Day 2 - 45 gets hull & hangar paint; 68 gets hull blisters worked on. 
 

Album image #8
One of the features on this build is that the #1 elevator on both will be in the down position, with the elevator well detailed. Here, 45 gets the #1 elevator detailed. The Dragon kit already has accurate elevator walls - they just need detail. 
 

Album image #9
The transverse piece represents the gallery deck, which is visible when the elevator is in the down position. 
 

Album image #10
BHR '45 #1 elevator finished (I did go back later with a grayer shade of black for scale effect). 
 

Album image #11
Album image #12
Album image #13
Because I built the hull blister slightly too high on 68 I decided it would be easier to just cut the kit off at the hangar deck, which would also let me control the hangar wall detailing. I built the hangar deck far forward enough to accommodate the #1 elevator well. 
 

Album image #14
Because the Hasegawa kit now had no landmarks for construction above the main deck at all, I transferred a set of frame marks to graph paper and glued that to the build dock, then made a guide that could be placed over the model to mark the centerline and frame locations as needed. 
 

Album image #15
Album image #16
After studying the photos of CV-16's SCB-27C modernization, which involved cutting the forward part of the bow off, I decided to do the same, and cut the kit bow off at frame 5. 
 

Album image #17
I then used reduced copies of tracings of the plans to add main, 2nd, and forecastle decks up to the frame 1 (FP). 
 

Album image #18
Album image #19
Album image #20
The hangar decks walls were a sheet of .040, with an outer skin of .020 so the openings would not be overly thick. I decided to include a "lip" at the top to serve as a guide for aligning the kit flight deck and eventually the .020 sheet final flight deck. 
 

Album image #21
I reused the kit's forward "wall" as a guide to align the flight deck. 
 

Album image #22
The bow was made up of multiple sheets of .040 with .020 spacers at the FP and A-F points, which are marked on the graph paper. This is probably the second one, A. 
 

Album image #23
Here the forward 5" gallery has been framed up, the escalator from Model Mopnkey added, and the opening for elevator #3 made. 
 

Album image #24
Album image #25
This shows the tracing of the plans to provide the necessary templates for construction. The tracings were copied to provide a draker reproduction, then reduced to 27%. 
 

Album image #26
The #1 elevator well is roughed in. 
 

Album image #27
The elevator well is complete (except detailing) and the flight deck cut to accommodate it. This photo shows what isn't apparent in photos - that the enlarged elevator was also extended aft. 
 

Album image #28
A feature of the SCB-27C modernizations is the complete deletion of the "boat deck" on the starboard side aft in favor of a larger hangar deck. This photo shows the -27A Oriskany, the 1945 CV-31, and the -27C CV-31. It's not immediately apparent, but only the blister top is outside the hangar. 
 

Album image #29
The elevator opening is perfect - except that it's several times too thick, especially with another layer on plastic yet to come on top of it. Time for a new plan. 
 

Album image #30
Album image #31
Album image #32
These are the Model Monkey islands for both ships. 
 

Album image #33
I chopped a large rectangular hole to allow the elevator to rise up to the existing flight deck level. 
 

Album image #34
Here it's apparent entire elevator well has been trimmed up .060. 
 

Album image #35
Album image #36
Album image #37
The bow has been built up in layers and the backing for the putty on the sides. The other pieces are the gallery deck undersides, which will be somewhat visible through the elevator openings and door. 
 

Album image #38
Album image #39
Album image #40
The SCB-27C/SCB-125 ships had vertical sides forward and I "plated" those in. The hull curved up smoothly from the waterline and there is no "knuckle" at the forecastle deck as there is in the -27A and -27C ships, so I expected a lot of sanding, so the sides also have wire glued at the knuckle.  
 

Album image #41
Album image #42
One very good thing about the Hasegawa kit is that the flight deck has transverse supports underneath, and the catwalks serve as very effective supporting shelves, and I used those as guides to build up the angled deck. From back to front there are .040 supports, with a .020 layer on top to match the catwalks, with another layer of .040 on top to bring it to existing flight deck level. The pencil lines are expansion joints, which I discovered also happen to be where the angles on the added flight deck change. 
 

Album image #43
Album image #44
Album image #45
BHR '45 has to be backdated from the kit, which represents it in 1951-52. Once thing I noticed was that the foremost gun tub - which was added after completion in 1944, was lower. This shows the original tubs and catwalk. The flight deck round-down has already been trimmed back. 
 

Album image #46
Here the kit catwalks are replaced with thinner .020 strip, the forward tub is lower, and the walkways are in place under the round-down, using Tom's PE. 
 

Album image #47
68 has the angled deck complete. 
 

Album image #48
Album image #49
The modernized Essexes appear to have had their wartime elevators shirted outwards 4-6" to accommodate the blistered hull, hence the white strip. What I was not aware was that the elevators didn't change in dimensions when the ships received angled decks, with the exception of a small round down at the forward end. So I just used the kit elevator. 
 

Album image #50
The sponsons are in place, and the gallery deck enclosed. 
 

Album image #51
Album image #52
This shows the gallery deck being thickened. 
 

Album image #53
This underside view shows the construction of the sponsons and gallery deck undersides. 
 

Album image #54
Album image #55
Started down the port side gallery decks now - note the cutout for the never-mounted gun director has to be filled in. 
 

Album image #56
Album image #57
Final 45 port gallery decks - top. Note that the 40mm mounts are all lower than the kit calls for. Many late war Essexes had their mounts lower, likely for weight and stability reasons. 
 

Album image #58
Final 45 stbd gallery decks - top. 
 

Album image #59
Final 45 stbd gallery decks - bottom. 
 

Album image #60
Final 45 port gallery decks - bottom. Note how many places the gallery decks must be built up so that they run into the side of the ship at full thickness. 
 

Album image #61
Album image #62
Album image #63
The final flight deck pieces start to go on. This is the section from the first expansion joint to the second. Note the "lip" is still present to use as a guide. 
 

Album image #64
I put tubes inside my islands so they can be mounted on a stand and worked on separately from the ship. I also add alignment posts so they can be placed and removed easily until final attachment. 
 

Album image #65
The final flight deck went on way faster than I had thought. 
 

Album image #66
Album image #67
The bow ended up needing some additional sanding to get the proper concave shape at the sides, and in the process I discovered the vertical side forward was too low, so I extracted the wire and carefully sanded the knuckle up. I wire cutwater is visible. 
 

Album image #68
I scratchbuilt the stern deck structure, but the kit supports were invaluable. 
 

Album image #69
To my surprise, the structure slid in and out, so I could leave it out until the stern was painted. 
 

Album image #70
Album image #71
Just a reminder the 68 in the middle is actually the same kit as 9 in the back. 
 

Album image #72
Album image #73
#1 elevator detailed. 
 

Album image #74
Album image #75
Finish trimwork for the elevator ended up being a lot simpler than I had expected, and left me with a flight deck opening that, if not exactly as thin as the actual flight deck plating, was think enough that it looked good. 
 

Album image #76
Album image #77
Again, the enlarged elevator is substantially longer than it at first appeared. 
 

Album image #78
Album image #79
Starting on the pole mast and tractor parking platform. 
 

Album image #80
An interesting shot of a -27A, a -27A & -125, and a -27C/125 under construction. 
 

Album image #81
Flight deck marked for detailing. 
 

Album image #82
I decided to add .05" sheet for the steel landing deck, bomb elevators, and catapults. 
 

Album image #83
I tried Gunship Gray FS36118 for the flight deck but it seemed too light, so I switched to a Panzer Grey. 
 

Album image #84
3D printed F6Fs and TBMs are in, and look pretty good after multiple thin coats of glossy Sea Blue. 
 

Album image #85
First batch of hull detailing. 
 

Album image #86
Second batch of hull detailing. 
 

Album image #87
3D printed anchors in. The box contains six, so I have enough to replace the ones on '68 as well. 
 

Album image #88
The striping is a little wide, so I narrowed it with a brush - here the narrowing is up to the #3 elevator. Note that the centerline of the elevator and the striping is not the same. 
 

Album image #89
The bow on '68 has the accurate portholes and round-down (give or take). '45 has white deck striping from the Dragon Princeton kit and GMM flight deck numbers that are almost 30 years old. 
 

Album image #90
45 has striping narrowed. 68 has GMM numerals - fortunately for me she changed from shadowed numbers sometime in '67, so just white in '68. I have started applying other flight deck decals using Starfighter's Nimitz-class carrier set, since they are sold out of the postwar Essex set. The good side of this is that there's twice as much of everything. 
 

Album image #91
45 gets flight deck structures, and starts getting the flight deck weathered. 
 

Album image #92
Adding 40mm quads. 
 

Album image #93
More striping and trim on CVA-31. 
 

Album image #94
Catwalks port side forward. 
 

Album image #95
Flight deck decaling complete. 
 

Album image #96
"Beware" decal up in #1 elevator well. 
 

Album image #97
Port side aft catwalks. 
 

Album image #98
Port side forward piping and hatchways, 
 

Album image #99
Starboard side aft before detailing ... 
 

Album image #100
... and after detailing. 
 

Album image #101
Starboard midships detailing. 
 

Album image #102
Album image #103
Album image #104
Portside aft piping and detailing. 
 

Album image #105
Bridle catcher construction. 
 

Album image #106
Bridle catchers complete. 
 

Album image #107
5"/38 caliber mounts by Blue Ridge Models 
 

Album image #108
Album image #109
Posts in place to support the main deck railings. 
 

Album image #110
Starboard forward railings in place. 
 

Album image #111
#3 elevator structure assembled from a WW II #2 elevator (with some modifications). 
 

Album image #112
Elevator in place. 
 

Album image #113
Elevator nets in place. 
 

Album image #114
Album image #115
3D printed aircraft from 1968 air group are in. 
 

Album image #116
Testing out new aircraft. 
 

Album image #117
Installing the stack grille is just an excuse to put CVA-31 next to CV-34. 
 

Album image #118
I discovered that the #1 elevator well had been repainted black by 1968, so had to repaint the well. 
 

Album image #119
On the positive side, some clear photos allowed me to confirm I needed three warning decals. 
 

Album image #120
CV-31 (and CV-9) get starboard bow 20mms, railings and floater net baskets, and radio antennae. 
 

Album image #121
Stern gets railing, a closed chock, and nameplate. 
 

Album image #122
Cleaned the paint off the waterline plate so I can prove yes, this is the Hasegawa kit. 
 

Album image #123
White border around #1 elevator. 
 

Album image #124
#2 elevator support structure (and railing) in place. 
 

Album image #125
CV-31 railings & baskets back to the island. 
 

Album image #126
Port side aft catwalk railings & baskets in place. 
 

Album image #127
Port side aft catwalk railings & baskets in place. 
 

Album image #128
CV-31 railings, 20mms, baskets and antennae complete on port side. 
 

Album image #129
CVA-31 main deck port side railings complete (with closed chocks). 
 

Album image #130
Album image #131
Album image #132
Album image #133
Album image #134
Album image #135
Album image #136
Album image #137
Album image #138
Album image #139
Album image #140
Album image #141
Album image #142
Album image #143
Album image #144
Album image #145
Album image #146
Album image #147
Album image #148
Album image #149
Album image #150
Album image #151
Album image #152
Album image #153
Album image #154
Album image #155
Album image #156
Album image #157
Album image #158
Album image #159
Album image #160
Album image #161
Album image #162
Album image #163
Album image #164
Album image #165
Album image #166
Album image #167
Album image #168
Album image #169
Album image #170
Album image #171
Album image #172
Album image #173

Comments

12 29 August 2020, 20:36
Dave Flitton
Watching
30 August 2020, 19:56
Martin Oostrom
Now that is some serious surgery and detailing.
7 November 2020, 21:23
Michael Smith
Yeah, but I'm having fun!
7 November 2020, 22:08
Guillaume Boulanger
Amazing built great job
4 January 2021, 13:36

Album info

Double build of CV-31 in 1945 and 1968.

173 images
1:700
Completed
1:700 USS Bon Homme Richard CV-31 (Dragon 7063)1:700 USS Essex CV-9 (Hasegawa 44108)1:700 USN Aircraft Carrier (Gold Medal Models 700-7)2+

All albums

View all albums »