Logo
scale modeling database | stash manager
StevenVD
Steven Van Dyck (StevenVD)
BE

Sherman Crab

Scale:
1:35
Status:
Completed
Started:
July 28, 2018
Completed:
May 31, 2019
Time spent:
10 months

This conversion of the M4A4 requires a mine-flail kit, provided by Resicast. Location of the vehicle is undecided.

Project inventory

Full kits
35-016
British Army
Sherman V (M4A4)
ASUKA Model 1:35
35-016 2016 New box
Detail and Conversion sets
35.1133
CRAB Mk.1 Conversion for Sherman M4A4
Resicast 1:35
35.1133 2010 New parts
AB3547
Sherman Cuff type Workable Track Link Set
Bronco 1:35
AB3547 2011 New tool
Figures
F35189
British 8th Army Tank Crew (2fig)
CMK (Czech Master Kits) 1:35
F35189
/search.php?q=*&fkMATEID[]=15656&showast=no&fkWORKBENCH[]=WB15656&page=projects&project=16352
 
 

Project references

M4 Sherman Tank (Haynes )
M4 Sherman Tank 1941 onwards (all variants)
Pat Ware
2012
Sherman Crab Flail Tank (Osprey Publications 139)
Sherman Crab Flail Tank
New Vanguard No. 139
David Fletcher
2007

Photoalbums

Sherman Crab
175 images
View album, image #160
1:35
Project: Sherman Crab
1:35 CRAB Mk.1 (Resicast 35.1133)1:35 Sherman V (ASUKA Model 35-016)1:35 Sherman Cuff type Workable Track Link (Bronco AB3547)1+

Comments

13 October 2015, 14:01
Steven Van Dyck
The build has begun. I started with the wheels, as in probably te most of Sherman topics. Only the rivet idea of the last picture I don't really care for... 144 rivets to shave from the sprue and aim to the wheel inside without locator holes.
31 July 2018, 21:25
Steven Van Dyck
The rivets are done anyway and the bogies are finished and remain workable. Only last minute I discovered an error and had to switch each wheelpair.
4 August 2018, 21:47
Steven Van Dyck
The hull is assembled, but I once let my vigilance drop and mixed up the steps. I had to pry the hull open again and squeeze the exhaust module in.
7 August 2018, 21:03
Steven Van Dyck
The first resin parts are emerging. Some small parts are for periscope protection. Removing the original periscope hatches was not easy.
10 August 2018, 16:56
Steven Van Dyck
Cutting the tracklinks and cleaning them. The ice cream cup is the most critical instrument.
19 August 2018, 09:57
Steven Van Dyck
The tracks are ready and fitted to the wheels. There are 8 extra links per side required due to the longer M4A4 hull, luckily Bronco provided 26 extra's.
21 August 2018, 21:41
Steven Van Dyck
The flail arm connections are made. One piece of resin had to be thermoformed with a heated metal rod. I replaced the plastic rod with tube so it's shaped smooth. The last picture shows a difference in the real Crab, I'll probably adapt that.
23 August 2018, 21:01
Steven Van Dyck
The chains are also thermoformed and glued to the rotor.
2 September 2018, 22:24
Steven Van Dyck
The rotor and the spare chain racks are finished.
3 September 2018, 20:28
Steven Van Dyck
Humbrol Tank Grey has been applied as the primer.
19 September 2018, 21:58

We use cookies for a great and free experience. By continuing to browse the site you agree to our use of cookies.

Essential cookies are for: preferences, security, performance analytics and contextual advertising.

Privacy policy »   Continue