modelářská databáze | správa kitníku
Yellowwing
Bernhard Schrock (Yellowwing)
DE

Martin SP-5B Marlin

Měřítko:
1:72
Status:
Dokončeno
Započato:
May 31, 2017
Dokončeno:
October 16, 2017

Although this kit is 45 years old but with a bit of improvisation it will be possible to build from this a useable Marlin. Shin Meiwa was almost as old and it also worked🙂

Our world ist really very small. During my research I discovered the website of Mr. Tom Bigley. He flew the Martin Marlin especially the RP 16 of the VP-31 too. He was so kind to share with me a lot of very interesting information about the Martin Marlin.

The specific Marlin I am modeling belonged to VP-31 which was a training squadron based at NAS North Island, near San Diego, CA. It was designated as a "Replacement Air Group", referred to as "the RAG", and there was a sister squadron (VP-30) based on the east coast. ALL pilots and aircrew went through "final polish" training in the RAG, enroute to their operational Patrol Squadron. The students were a mix of brand new pilots and aircrew coming directly from the training com, second and third tour pilots and aircrew coming from other assignments and even officers headed to a squadron as the new XO/CO. (Information courtesy of Mr. Tom Bigley)

Inventář projektu

Kompletní modely
K9
Martin SP-5B Marlin
Hasegawa 1:72
K9 (K009) 1980 Nová krabice
Deatilní a konverzní sady
AL7013
Wright R-3350
PlusModel 1:72
AL7013 2016 Nová forma
/cs/search.php?q=*&fkMATEID[]=14143&showast=no&fkWORKBENCH[]=WB14143&page=projects&project=30844
 
 

Fotoalba

202 obrázky
Martin SP-5B Marlin - completedView album, image #183
1:72
1:72 Martin SP-5B Marlin (Hasegawa K9)1:72 Wright R-3350 (PlusModel AL7013)

Část mého Sbírka

Flying boats
Nápady 1×Dokončeno 6×Pozastaveno 1×Zrušeno 1×

Komentáře

7 June 2024, 02:14 -

We use cookies for a great and free experience. By continuing to browse the site you agree to our use of cookies.

Essential cookies are for: preferences, security, performance analytics and contextual advertising.

Privacy policy »   Continue