Logo
scale modeling database | stash manager
mfelsing
MAC FELSING (mfelsing)
US

Kettenkrad HK 101 from ESCI @ 1975 - Build

Album image #1
Album image #2
Album image #3
Album image #4
Album image #5
Album image #6
Album image #7
Album image #8
Album image #9
Album image #10
Album image #11
Album image #12
Album image #13
Album image #14
Album image #15
Album image #16
Album image #17
Album image #18
Album image #19
Album image #20
Album image #21
Album image #22
Album image #23
Album image #24
Album image #25
Album image #26
Album image #27
Album image #28
Album image #29
Been a while since a added pictures. Got the battery, posts and wires just right 
 

Album image #30
That allowed me to finally glue the right side battery compartment and fuel tank into position  
 

Album image #31
Engine under construction next 3 photos  
 

Album image #32
Album image #33
Album image #34
Album image #35
Album image #36
Album image #37
Album image #38
Album image #39
scratch building fuel pump from one of the models hose clamps 
 

Album image #40
added some brass rod to hold the fuel lines 
 

Album image #41
Added a platform for the fuel pump 
 

Album image #42
Did a little surgery on the coolant pipes and hoses. Will add hose clamps from model motor cars 
 

Album image #43
Album image #44
Album image #45
Album image #46
Album image #47
Album image #48
Changed the hoses to a thinner walled hose from Model Motor Cars along with the clamps. Better fit and look. 
 

Album image #49
Next step is to finish the piping and touch up the paint 
 

Album image #50
Album image #51
Motor Essentially complete. Coolant pipes, hoses and clamps finished 
 

Album image #52
Will have to do some surgery on the radiator housing to get the pipes to fit and look right. 
 

Album image #53
Album image #54
Album image #55
Spark plugs, distributor and fuel pump came out well. Have to add the fuel line to the engine from the tanks 
 

Album image #56
Album image #57
Finished one set of tracks. This is the test-fit. Suspension works. Now to paint and weather the tracks and start on the next set. 
 

Album image #58
Just a glimpse of what it is shaping up to look like. Test fit tracks, engine radiator housing, hood, drivers seat and dash assembly. 
 

Album image #59
Right front oblique view. That one set of tracks represents about 60 hours filing and fitting. 42 track links with 42 tread caps. 
 

Comments

12 March 2018, 00:33

Album info

I accidentally deleted the 22 pictures I had so I am reloading them. I started this build in the Nov/Dec timeframe last year. From Jan 14, I had been working on Steps 1, 2, and 3 in th instructions. Since then, I have worked on the engine, transmission, radiator housing, front panel. I have primed much of the model, Mr. Surfacer 1200 rattle can. and have started painting the interior and major subassemblies. I had initially used Vallejo Dunkel Gelb, but decided to overpaint that with Desert Yellow, which is more tan.

59 images
1:9
On hold
Scratchbuilt

All albums

View all albums »