base de données du maquettisme | gestionnaire de stock
StevenVD
Steven Van Dyck (StevenVD)
BE

Sherman Crab

Échelle:
1:35
Statut:
Terminé
Commencé:
July 28, 2018
Terminé:
May 31, 2019
Temps passé:
10 months

This conversion of the M4A4 requires a mine-flail kit, provided by Resicast. Location of the vehicle is undecided.

Inventaire du projet

Maquettes complètes
35-016
British Army
Sherman V (M4A4)
ASUKA Model 1:35
35-016 2016 Nouvelle boîte
Kits de détaillage et conversions
35.1133
CRAB Mk.1 Conversion for Sherman M4A4
Resicast 1:35
35.1133 2010 Nouvelles pièces
AB3547
Sherman Cuff type Workable Track Link Set
Bronco 1:35
AB3547 2011 Nouvel outillage
Figurines
F35189
British 8th Army Tank Crew (2fig)
CMK (Czech Master Kits) 1:35
F35189
/fr/search.php?q=*&fkMATEID[]=15656&showast=no&fkWORKBENCH[]=WB15656&page=projects&project=16352
 
 

Références de projet

M4 Sherman Tank (Haynes )
M4 Sherman Tank 1941 onwards (all variants)
Pat Ware
2012
Sherman Crab Flail Tank (Osprey Publications 139)
Sherman Crab Flail Tank
New Vanguard N° 139
David Fletcher
2007

Albums photos

175 images
Sherman CrabView album, image #160
1:35
Projet: Sherman Crab
1:35 CRAB Mk.1 (Resicast 35.1133)1:35 Sherman V (ASUKA Model 35-016)1:35 Sherman Cuff type Workable Track Link (Bronco AB3547)1+

Commentaires

13 October 2015, 14:01
Steven Van Dyck
The build has begun. I started with the wheels, as in probably te most of Sherman topics. Only the rivet idea of the last picture I don't really care for... 144 rivets to shave from the sprue and aim to the wheel inside without locator holes.
31 July 2018, 21:25
Steven Van Dyck
The rivets are done anyway and the bogies are finished and remain workable. Only last minute I discovered an error and had to switch each wheelpair.
4 August 2018, 21:47
Steven Van Dyck
The hull is assembled, but I once let my vigilance drop and mixed up the steps. I had to pry the hull open again and squeeze the exhaust module in.
7 August 2018, 21:03
Steven Van Dyck
The first resin parts are emerging. Some small parts are for periscope protection. Removing the original periscope hatches was not easy.
10 August 2018, 16:56
Steven Van Dyck
Cutting the tracklinks and cleaning them. The ice cream cup is the most critical instrument.
19 August 2018, 09:57
Steven Van Dyck
The tracks are ready and fitted to the wheels. There are 8 extra links per side required due to the longer M4A4 hull, luckily Bronco provided 26 extra's.
21 August 2018, 21:41
Steven Van Dyck
The flail arm connections are made. One piece of resin had to be thermoformed with a heated metal rod. I replaced the plastic rod with tube so it's shaped smooth. The last picture shows a difference in the real Crab, I'll probably adapt that.
23 August 2018, 21:01
Steven Van Dyck
The chains are also thermoformed and glued to the rotor.
2 September 2018, 22:24
Steven Van Dyck
The rotor and the spare chain racks are finished.
3 September 2018, 20:28
Steven Van Dyck
Humbrol Tank Grey has been applied as the primer.
19 September 2018, 21:58

We use cookies for a great and free experience. By continuing to browse the site you agree to our use of cookies.

Essential cookies are for: preferences, security, performance analytics and contextual advertising.

Privacy policy »   Continue